Brief Description: Finished up drilling an start T-405 fabrication
- Drilled the Main Spar attach screw holes and the W-423 to final size using a #19 bit
- Disassembled the tank and labeled parts
- Began fabricating the T-405 Tank Attach angle
- During tank disassembly, the outboard most Z-Bracket rivet holes are too close to the bracket web, will need to order new Z-Brackets before completing the fuel tank assembly.