KitLog pro

Powered By Kitlog Pro v2.0

My RV-7A
' style=
Date:  4-8-2009
Number of Hours:  2.00
Manual Reference:  Tanks
Brief Description:  Finished up drilling an start T-405 fabrication

- Drilled the Main Spar attach screw holes and the W-423 to final size using a #19 bit

- Disassembled the tank and labeled parts

- Began fabricating the T-405 Tank Attach angle

- During tank disassembly, the outboard most Z-Bracket rivet holes are too close to the bracket web, will need to order new Z-Brackets before completing the fuel tank assembly.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.