Powered By Kitlog Pro v2.0
My RV-7A
RV-7A
All
12-29-2008
< Previous Log Entry
Next Log Entry >
Date:
12-29-2008
Number of Hours:
1.50
Manual Reference:
Brief Description:
Riveted platenuts to left spar and installed the t
Riveted the fuel tank attachment platenuts to the left spar and did some priming on the spar where anodizing was removed.
Fabricated, fitted and primed the tie down assembly to the left wing spar.
No pictures this time.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
116
255
Ailerons
1
6
Empennage
43
94
Fuel Tanks
4
10
Fuselage
14
20
Miscellaneous
3
4
None
2
2
Paint
1
Shop
1
2
Shop Supplies
4
20
Technical Counselor
1
1
Tips and Tricks
1
Tools
2
Wings
39
96
Copyright © 2001-2024 Matronics. All Rights Reserved.