KitLog pro

Powered By Kitlog Pro v2.0

My RV-7A
' style=
Date:  11-22-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Finished leading edges and test fit to HS

Finished riveting leading edge of left elevator after attempting to eliminate the pillowing. Use the hand seamer to complete the roll (surprise) and removed about 98% of the pillowing. I am a happy camper with this solution.

Test fit the elevators to horizontal stabilizer. Had to trim the stab ends to give clearence for the elevator CW and trimmed the horizontal stabilizer spar to allow elevator control horns clearence to move full down.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.