KitLog pro

Powered By Kitlog Pro v2.0

My RV-7A
' style=
Date:  11-18-2008
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Elevator leading edge rolling part deaux

Re-rolled the leading edge of the left elevator. This improved the pillowing experienced during prior attempts. Still some pillowing between the rod-end bearing cut-outs. Clecoed the edges together. Overlap looks good and the dimensions are ok. Match drilled (#40) and clecoed. Going to sleep on it before commiting to riveting.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.