KitLog pro

Powered By Kitlog Pro v2.0

My RV-7A
' style=
Date:  11-17-2008
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Right Elevator edge rolling and hardware installat

Like the left elevator, rolled the right elevator leading edges. Even though I secured the elevator to the worktable for rolling, I still got some pillowing when I clecoed the edges together. The overlap is good. I attempted "spot" roll the edges with the most pillowing and this technique worked to some degree but I don't want over do it here. The bottom leading edge roll is bent toward the spar more than the top edge, making the rivets have less grip. Rather than continue beating myself up on this today, I will walk away and tackle it more tomorrow.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.