KitLog pro

Powered By Kitlog Pro v2.0

Steves RV-12 Web Site
' style=
Date:  3-28-2010
Number of Hours:  60.00
Manual Reference:  
Brief Description:  Left Wing Construction

One month since my last posting. Approxv 60 hours spent in that month working on the wings. It took nearly 30 hours to prep all of the ribs, including deburring and priming. I also had tool problems this month, everything from my manual rivet puller, to my pneumatic rivet puller, to my air compressor failed at some point and each in turn had to be repaired in order to proceed.

At this point I have completed prep on ALL ribs and built and mostly skinned the left wing assembly. I am ready to skin the top outboard portion of the left wing. One more skin to go and then it's on to the wingwalk and the wingtip.All but the rib prep will then be repeateed for the right wing which should go much quicker now that I'm familiar with how things go together.

I ordered my fuselage kit on March 11th and I'm hopeful for a mid June delivery.
' style=

Aft Ribs attached to spar

Aft Ribs attached to spar

' style=

Stall WArning switch assembly

Stall WArning switch assembly

' style=

Ready for rivets - outboard skin

Ready for rivets - outboard skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.