KitLog pro

Powered By Kitlog Pro v2.0

Steves RV-12 Web Site
' style=
Date:  7-11-2004
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Forward Fuselage Preparation

1. Finished fabricating attach clips. 2. Fit and drilled F719 R&L forward stiffners. 3. Fabricated, betn and drilled F917 R&L lower longerons. 4. Drilled lower longeron bolt holes to firewall attach brackets.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.