1. Rivited trailing edge of right aileron. 2. Rivited skin to ribs on right aileron 3. Drilled and mounted all hinge and bracket hardware on both ailerons. 4. Drilled leading edge ribs and spacers to left flap spar. 5. Drilled left bottom flap skin to table.