KitLog pro

Powered By Kitlog Pro v2.0

Steves RV-12 Web Site
' style=
Date:  3-15-2003
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Left Wing Priming and Prep

1. Finished drilling W-919 platenut holes 2. Cleaned and Primed leading edge ribs 3. Cleaned and primed joiner strip and platenuts 4. Cleaned and primed tank z brackets and platenuts 5. Cleaned and primed tank attach angle bracket 6. Reassembled leading edge with clecoes 7. Redimpled all leading edge ribs with tank dies for better fit. 8. Riveted platenuts to joint strip 9. Started riveting platenuts to tank Z brackets.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.