KitLog pro

Powered By Kitlog Pro v2.0

Steves RV-12 Web Site
' style=
Date:  12-2-2002
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Left Elevator dry-fit

Assembled left elevator skeleton and match drilled Assembled and match drilled left elevator counter-weight assembly. Match drilled skin to left elevator skeleton.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.