Fabricated, primed, and riveted gascolator bracket to firewall bottom with nutplate and tunnel rib, as directed. Removed protective vinyl from and deburred fuel Flo-Scan mountbracket, installed nutplates, final-drilled #30 attach rivet holes, deburred holes, and mounted riveted bracket to forward fuselage floor skin. Clecoed then riveted the forward lower fuselage assembly to the mid fuselage and bottom skin assembly.
Forward Lower Fuselage Assembly Attached to Mid Fuselage Bottom Assembly
Forward Lower Fuselage Assembly Attached to Mid Fuselage Bottom Assembly