KitLog pro

Powered By Kitlog Pro v2.0

Garys Web Site
' style=
Date:  12-23-2010
Number of Hours:  2.75
Manual Reference:  21-10
Brief Description:  Bulkhead Preparation

Remove protective vinyl, durred, and prepared blukhead flange, stub spar receptacle support, and stub spar receptacles, as directed. Countersunk 38 #40 nutplate attach rivet holes and 6 #30 holes in the bulkhead areas indicated. Enlarged three 1/8" holes in the builkhead to 7/16". Enlarged one 1/8" hole in the builkhead to 3/4". Modified one 7/8" bulkhead hole to make it completely circular, as directed.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.