KitLog pro

Powered By Kitlog Pro v2.0

Garys Web Site
' style=
Date:  6-28-2010
Number of Hours:  2.75
Manual Reference:  15-03
Brief Description:  Main Ribs

Trimmed forward flange off 6 left main ribs and 13 right ribs. Clecoed, match drilled, deburred, and reclecoed one of each of the left and right main ribs and doublers, as directed. Received verbal approval from Gus at Van's for six holes misdrilled in left main rib and doubler. He also suggested placing rivets in the misdrilled holes. Clecoed, match drilled, deburred, and reclecoed two of each of the left and right main ribs and flaperon hinge brackets, as directed.
' style=





' style=

Left and Right Main Ribs with Doublers

Left and Right Main Ribs with Doublers

' style=

Left and Right Main Ribs with Flaperon Hing Brackets

Left and Right Main Ribs with Flaperon Hing Brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.