Powered By Kitlog Pro v2.0
LARRY'S WEB SITE
Flybaby
All
10-26-2003
< Previous Log Entry
Next Log Entry >
Date:
10-26-2003
Number of Hours:
3.00
Manual Reference:
fig 1-21
Brief Description:
Instrument Panel Bow
Fabricated the instrument panel "bow" from 3/4" plywood per a method given in the plans. This was done with a sabre saw and a LOT of sanding.
Rough cut with the "grid" visible
The finished product
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Flybaby Home
Category
# Logs
# Hours
All
30
98
Flight Controls
2
9
Fuel System
1
4
Fuselage
20
67
Instruments
3
10
Jigs/Tools/Setup
1
2
None
3
6
Copyright © 2001-2024 Matronics. All Rights Reserved.