Powered By Kitlog Pro v2.0
Raymonds Web Site
RV-9
All
6-4-2013
< Previous Log Entry
Next Log Entry >
Date:
6-4-2013
Number of Hours:
25.00
Manual Reference:
DRAWING 1
Brief Description:
Manual Section 8 pages 15 thru 18
Fitted horizontal and vertical stabilizers as per Section 8 of manual. Used flat bed trailer to haul fuselage structure to airport. Mounted elevator and rigged as per Section 6 page 9. This log entry is for the period 5/10/2013 to 6/04/2013.
Elevator Mounted
Off to the Airport
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9 Home
Category
# Logs
# Hours
All
404
3415
Avionics
29
220
Empennage
56
432
Engine
84
500
Fuselage
132
1370
Miscellaneous
1
4
None
1
1
Wings
101
888
Copyright © 2001-2024 Matronics. All Rights Reserved.