Brief Description: Section 4 Metal Repair Procedures
As per AC 43.13-1B Acceptable Methods techniques & Practices, fabricated and installed .032 2024-T3 triangle brackets, by picking up groups of four rivets along each side of previous fuselage damage from pitch over in sod field on landing. Primered and riveted to structure using AD-3 & -4 rivets.