Powered By Kitlog Pro v2.0
My RV-7A
RV-7A
Fuselage
6-9-2012
< Previous Log Entry
Next Log Entry >
Date:
6-9-2012
Number of Hours:
3.00
Manual Reference:
Sec 8 DWG 34A
Brief Description:
Vent Lines
Modified the AN fitting by cutting at a 45 degree angle .
Use Proseal and screen to seal the intake from debris.
Fabricated the left and right fuel vent lines.
Sealled and torgued the AN fittings as required.
Fuel Tank Vent Lines
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
All
Avionics
Cockpit
Electrical
Elevators
Empennage
Engine
Firewall Forward
Fuel Tanks
Fuselage
Hanger
Horizontal Stab
Introduction
Miscellaneous
Mistakes
None
Paint Schemes
Practice Kit
Rudder
Shop
Shop Supplies
Tools
Vertical Stab
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.