Date:
4-20-2012
Number of Hours:
2.00
Manual Reference:
Sec 8 DWG 33
Brief Description:
Flap Mounting
Airport had the AN4-16 bolt that is required.
Fitted, deburred and primed all associated parts.
Assembled the Flap mounting hardware.
Temporarily installed the flap motor, and installed it in the aircraft.
Flap Motor