Powered By Kitlog Pro v2.0
My RV-7A
RV-7A
Miscellaneous
9-21-2009
< Previous Log Entry
Next Log Entry >
Date:
9-21-2009
Number of Hours:
1.00
Manual Reference:
Brief Description:
Built Tank Fixtures
I built the fuel tank holding fixtures per the plans.
I have set these aside and are ready to prep the spars.
We plan to work on both wings at the same time.
We will build the Wing gig to allow us to mount both wings side by side.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
All
Avionics
Cockpit
Electrical
Elevators
Empennage
Engine
Firewall Forward
Fuel Tanks
Fuselage
Hanger
Horizontal Stab
Introduction
Miscellaneous
Mistakes
None
Paint Schemes
Practice Kit
Rudder
Shop
Shop Supplies
Tools
Vertical Stab
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.