Powered By Kitlog Pro v2.0
My RV-10
RV-10
All
2-21-2020
< Previous Log Entry
Next Log Entry >
Date:
2-21-2020
Number of Hours:
2.50
Manual Reference:
6-4
Brief Description:
Vert Stab Prime/Rivet
Cleaned and scuffed the surfaces... primed and pounded some of the first rivets of the project. I stepped a bit out of sequence since i want to acid etch and alodine the rear spar doubler.basically the same process I used on the RV-7A.
Primed/Riveted Doubler/Hinge
Primed/Riveted Doubler
Pounded a few rivets
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
29
409
Cockpit
1
28
Elevators
2
106
Empennage
5
95
Horizontal Stab
5
82
Introduction
1
Rudder
5
60
Vertical Stab
10
38
RV-7A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.