KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  4-27-2022
Number of Hours:  1.30
Manual Reference:  
Brief Description:  Install Pitot Tube Line

I worked on what "should be" the last cabin to wing item that I needed to put into the fuselage that needed routing up the gear tower which is the pitot line. I have decided that I will have a union connecting the metal line in the wing with the plastic line that will snake through the fuselage to the instrument panel area.

I started by determining the routing for the line and then installed one more snap bushing where I wanted it to pass through the fuselage sidewall. Then I took the nylon hose and started winding it through the cockpit floor, the left gear tower and finally into the panel avionics area.
' style=

Installed snap bushing and line

Installed snap bushing and line

' style=

Routing up left gear tower

Routing up left gear tower

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.