KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  8-2-2019
Number of Hours:  3.20
Manual Reference:  
Brief Description:  F-810A Bulkhead - continued

I finished riveting the F-810A Bulkhead. It was a little more of a challange than I thought it was going to be.....and took a little longer than I thought.....but I got it all riveted.

I then completed hooking up the 1/8 inch portions of the static lines up to the "T" where the 1/4 inch lines connect. I am going to wait till I get some more things installed before putting the 1/4 inch line in because I am afraid of drilling into the larger line while installing the other items in that area.

I found these little standoffs for tie wraps that worked absolutely fantastic for running the static line. I just had to open up the bulkhead holes from 1/8 to 3/16 to snap the standoffs in and tie wrap the static line....looks good!
' style=

F-810A completely riveted

F-810A completely riveted

' style=

Installed all 1/8 static port lines

Installed all 1/8 static port lines

' style=

Tie wrap standoffs

Tie wrap standoffs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.