KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  6-18-2019
Number of Hours:  2.20
Manual Reference:  
Brief Description:  ELT Bracket #6

I completed getting the mount and hardware installed and torqued to the right specs.

Next I took the foam pieces I made to make a foam block and lay out for the fiberglass cubby I am making for the mid cabin cover for a little storage. I mixed some dry micro to use as a bonding agent between the layers of foam. After getting all the pieces slathered with micro and put together, I set it off to the side and placed a heavy tub of clecos on top to let it set.

I took a few minutes to look at the Vans static kit installation.
' style=

ELT Mount installed

ELT Mount installed

' style=

Making a foam block

Making a foam block

' style=

Reviewing static system install kit

Reviewing static system install kit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.