KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  2-4-2019
Number of Hours:  0.70
Manual Reference:  
Brief Description:  Engine Cable Routing in Gear Tower

I measured and marked the hole locations for routing the engine control cables through the left gear tower. I attached a string to the throttle and the firewall cable holes. It gave me an elevation of wher on the tower I wanted to drill the carry through holes.

Next I made and cut out a hole location template and decided where it needed to be placed on the tower. After pondering for a bit I was satisfied with the location and taped it to the area and used the center holes to mark the locations of the holes.
' style=

Preparing to mark tower holes

Preparing to mark tower holes

' style=

Hole location template

Hole location template

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.