KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  6-4-2018
Number of Hours:  2.20
Manual Reference:  
Brief Description:  Landing Gear - Drilling

I finished drilling the left gear to the fuselage. Performing certain operations on the QB kits can be a challange that slow build kits are able to avoid. I was able to drill the 1/4 inch inboard wear plates retainer bolt holes fairly easily. The outboard holes were a different story. I could not get the holes drilled with the gear in place so after drilling the inboard wear plate holes I decided to remove the gear and attack the problem in a different manner. That will happen in the next session. Anyway the gear was removed and the drilling almost complete as soon as I finish the outboard wear plate retention holes.
' style=

Right Gear Removed

Right Gear Removed

' style=

Left Gear Removed

Left Gear Removed

' style=

Gear Drilling almost complete

Gear Drilling almost complete

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.