KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  3-15-2018
Number of Hours:  1.30
Manual Reference:  
Brief Description:  Flip fuse and start landing gear

I was able to get the fuse flipped. Next I leveled the fuselage along both axis which took a little finessing.

Next I transferred the 7/16 holes trough the floors by using the hole in WD-813 as a guide for drilling the location of the hole in the floor skins.
' style=

Fuse Flipped and leveled

Fuse Flipped and leveled

' style=

Drilled 7/16

Drilled 7/16" hole in floor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.