KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  3-12-2018
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Landing Gear Prep

I got the parts for the landing gear install gathered up. Everything was wrapped in paper and bubble wrap. I got them set free from the paper and plastic bonds and inspected them. The gear brackets had some burrs around the machined surfaces so I took time to file and clean them up.
' style=

Vans Steel Gear Legs

Vans Steel Gear Legs

' style=

Gear Brackets

Gear Brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.