KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  5-15-2014
Number of Hours:  2.30
Manual Reference:  
Brief Description:  Fuselage Conduits

Located and drilled holes through bulkheads for 4 wire conduits. I sat down for a while to try and figure how many I would need and it appears that 4 would be enough. Deburred holes and began to wrestle the adel clamps in place to hold the conduits. Adel clamps are somewhat of a pain to work with.....but all and all it wasn't too bad.
' style=

Under floor conduits

Under floor conduits

' style=

Baggage area conduits

Baggage area conduits

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.