KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  4-19-2022
Number of Hours:  2.90
Manual Reference:  
Brief Description:  Ground Wires in Electrical Bay

This log really encompasses two days.....last session was a brief 20 minutes before my wife came down to inform me that the refridgerator was not cooling. I began to troubleshoot and found the evaporator fan had quit. I pulled it all apart and ordered a new one....after moving all the food to our second fridge in the mudroom! Waiting to get the new part to install......

Tonight I got back on the task. After securing a bundle of wires to the tie down with a ziptie I had to remove them...in clipping off the ziptie I cut a small wire. So now it was performing the task of either changing the wire or splicing. I looked over the situation and decided since the splice would be accessible that that would be the better option. So I got the soldering stuff and proceeded to splice

I then continued with getting wires tied and installed terminal fast-ons and got them situated on the ground block. Rinse and repeat operation.
' style=

Spliced Wire

Spliced Wire

' style=

More grounds connected

More grounds connected

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.