Date:  2-24-2022
Number of Hours:  3.70
Manual Reference:  
Brief Description:  Wire CB Panel

I separated the wires for the different rows and busses to get the breakers wired. I decided to start on the bottom row. It took some time as I wanted to make sure that I had extra wire for the future in the event that wires had to be cut and reattached.

I methodically went through the process of figuring out the right length to cut the wires followed by putting on the ring terminal and then labeling some and moving on to the next one. I got a number of wires connected before stopping for the night.
' style=

Getting the panel wired

Getting the panel wired