KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  2-16-2022
Number of Hours:  2.20
Manual Reference:  
Brief Description:  Ignition Buss

I finished off the ignition buss wires tonight. I put the console panel on for a little and got the length where I needed to cut the wires to length and add the ring terminals and labels to complete the buss. I used spiral wrap and lacing for a little more wire protection.

Next I routed the indicator light grounds from the Dsub. I put an adel clamp on the transponder mount to capture the wires and I will double them back in order to have service loop for the wires since they solder to the LED lights. I will not hook them up until I get the "real panel" in place as I have the prototype panel in place currently and the light wires would have to be cut to get the lights back out....which is counterproductive. I put labels on the wires to identify the grounds.
' style=

Ignition Buss wires labeled with terminals

Ignition Buss wires labeled with terminals

' style=

Routing Panel Indicator Grounds

Routing Panel Indicator Grounds

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.