KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  10-3-2021
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Work on Flap Actuator and AOA Flap Switch

In between working with Ralph or being given a task to accomplish by him, I worked on getting the clearance for the flap actuator by removing material with a drum sander on the dremmel.

I also began to work on the flap microswitch mount for the AOA flap position indicator. I decided with all the stuff going on with the left side of the flap weldment that I would mount the AOA switch on the right side. After pondering I came up with a design in my mind and began getting the bracket that would mount on top of the flap weldment hold down block to hold the microswitch. I got the holes drilled after making a little transfer punch that I slid down the hole to mark the bracket. I will slot the holes in the bracket a little so I can have adjustment.

Last Friday I also received the updated version of the Flight Data Systems GT-50 Chronometer-G meter-USB charging port-ammeter-and instant coffee maker!

That was this weekends work sessions.
' style=

Clearance for Flap actuator

Clearance for Flap actuator

' style=

Micro switch for AOA design

Micro switch for AOA design

' style=

Updated Flight Data Systems GT-50

Updated Flight Data Systems GT-50

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.