Powered By Kitlog Pro v2.0
Bob's RV-8 Build Site
RV-8
Electrical
11-15-2020
< Previous Log Entry
Next Log Entry >
Date:
11-15-2020
Number of Hours:
2.80
Manual Reference:
Brief Description:
Assemble Electrical Bay Cover
Having painted all the parts for the electrical bay cover, I decided it was time to assemble it. Got out the rivets and squeezer and got to work.
With the time remaining before quitting for the night I decided to drill the GIB throttle guides for the rivets that will keep them on place.
Electrical Bay Cover Assembled
OPS Check Good
GIB Throttle Guides
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1705
4167
Additional Help
28
168
Avionics
131
374
Canopy
130
337
Cowling
32
78
Electrical
244
651
Empennage
122
310
Engine
137
372
Fiberglass
90
229
Final Assembly
6
30
Fuselage
506
1163
Interior Seats, etc.
5
14
Landing Gear Finishi
18
56
Life Events
47
Lighting
11
20
Misc.
67
43
None
2
Paint
11
39
Prop
2
1
Rework Items
55
101
Signings
1
Smoke Tank
11
29
Wing Tips
22
77
Wings
27
75
Copyright © 2001-2024 Matronics. All Rights Reserved.