KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  12-30-2022
Number of Hours:  4.80
Manual Reference:  
Brief Description:  Front Baffle, Oil Cooler Support & Filter Mount

Continued with misc items. I marked, cut and finished the front baffle.

I decided next to get the oil cooler support bracket on the baffle. I don't have an oil cooler to support on the back of the baffle area but the bracket really needs to be there for the baffling so I drilled, deburred, and then contoured the baffle to fit the cowl contour.

Had to work on the air filter bracket securing screws due to the forward baffle.
' style=

Oil Cooler Support

Oil Cooler Support

' style=

Army of Paperclips doing their job

Army of Paperclips doing their job

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.