KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  8-10-2022
Number of Hours:  2.60
Manual Reference:  
Brief Description:  Red Cube Line & Cowling Spacer

Last night I turned again to the Red Cube hose set up and had some great discussions about the various configurations of the cube hose with Rick and Rob. I called Electronics International that makes the cube and asked more questions about fittings. They discourage the use of elbows on the inlet side of the cube due to potential flow disturbance....but folks are running them with elbows and have had no problem.

Rick is going to send me pictures of his fuel flow module so I will have to make a decision after pondering it more.

I went on to just about completing the drawing for the mock up for the plate that will be used for fitting the cowling. Sometimes things work well enough having them designed and drawn in my head....but I don't want to ruin it and rebuy the material at todays inflationary prices.....so I took time to draw it out.
' style=

Working on Red Cube Line

Working on Red Cube Line

' style=

Finishing Cowling Mockup Dwg

Finishing Cowling Mockup Dwg

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.