KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  6-14-2020
Number of Hours:  2.70
Manual Reference:  
Brief Description:  Oil Cooler cable routing

I continued with the routing of the control cable to the butterfly valve. One would think some of these items would take only a few minutes to perform.....but by the time you decide on the course of action then mark and drill holes, install pass throughs....before you know it almost three hours have passed!!!

I added the adel clamp on the rear side of where the cable exited the gear tower on the angle attached to the fuselage side skin. I then located the firewall passthrough. I found a Bowden 3/16 inch cable clamp. The size was just right and I carefully located it in a small area between the side fuselage skin and the firewall angle and drilled the hole for installing it.

Last step will be attaching the cable to the butterfly valve arm.
' style=

Oil cooler control secured

Oil cooler control secured

' style=

Routing thru right gear tower

Routing thru right gear tower

' style=

Thru lower baggage and F/W

Thru lower baggage and F/W

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.