KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  4-1-2020
Number of Hours:  0.60
Manual Reference:  
Brief Description:  Aeroled Landing Lights #4

Now that the lights were rough cut I began to bring them to the "secondary finish" stage. This is where you sand the opening where you have about 1/4 inch on the inside of the light sticking through the opening and about 2 inches from the face of the light to the revealed portion sticking out of the wingtip.

It didn't take it that long from rough to secondary stage. I am working on some other things this week so I am trying to at least get a little build time in each night.
' style=

RT Light Secondary Fitting

RT Light Secondary Fitting

' style=

Left Light Secondary Fitting

Left Light Secondary Fitting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.