Date:  11-22-2021
Number of Hours:  3.20
Manual Reference:  
Brief Description:  AOA Display Positioning

I temporarily put the windscreen in place to check the clearance on the AOA position to make sure it would not encroach upon the windscreen.

To install the display mount I cut a slot into the mock up panel and slid the lower part of the mount below. I can use screws to hold the mount and 1/8th inch spacers to fill the gap between the bracket and the glaresheild. This gets the display as low as possible and hides the mount except for the two screws. Of course I have to route the sheilded cable to the back of the display but that will be easy enough.

The paint job on the CB panel did not come out well due to some prepwork on sanding the panel so I decided to throw some stripper on it and remove the paint. I then spent time sanding all the imperfections from the panel to prep it for another coat of paint....since it is off I want to get it right!
' style=

Installed windscreen to check clearance

Installed windscreen to check clearance

' style=

Slot for bottom of mount to be inserted

Slot for bottom of mount to be inserted

' style=

Stripped CB Panel

Stripped CB Panel

' style=