After returning late Friday evening from a ten day work trip I was able to get a little work done before leaving again on Monday. I had a jungle for grass that had to be mowed since we had too much rain to mow prior to leaving for the work trip. It was dry enough when I returned to mow (about 3 acres) so it was a priority followed by other required "duties".
On Sunday I was able to get some time in on the project. I drilled and riveted the leading edge of the reworked left elevator. Then I replaced the rod ends into the elevator. Finally, I did a little fitting of the fiberglass fairing and drilled it. The left elevator is officially back to the place where it was before the "unfortunate accident".