KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  9-9-2018
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Left Elevator Rework

Mostly riveting tonight. I had to insert blind rivets into E-713, E-606PP, and E-701 Trim Tab Bends.
I put the Trim Tab on to check the elevator clearance between the bent tabs and the trim tab.
The gap is supposed to be a minimum of 3/32 (.093) and it is actually about 3/16 (.187) . So it is well past the minimum....I was thinking of redoing the hinge....but we will see. I would like the clearance to be closer to 1/8 (.125). I don't think I have any more of this hinge....will look and see.
' style=

Closer to being done

Closer to being done

' style=

Elevator needs trim and rolled edges to be completed yet

Elevator needs trim and rolled edges to be completed yet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.