Date:  6-10-2022
Number of Hours:  7.80
Manual Reference:  
Brief Description:  Ralph over for a work session

Ralph had some down time and said he could come over to help....which I always take him up on!

He started with putting two nutplates in the back end of the GTN-650 tray that had to be done for the final item to complete the setup.

I had installed all the COAX ends on the antenna ends of the radios and nav equipment....so Ralph got the ends installed for the ends with the boxes which took a bit of time. Then he got the black boxes and started putting them into their locations. We are going to get the power on and get things fired up, but not today! We already did a power/ground continuity check which was all good but there needs to be a few other things checked before we flip the switch.

Since we had a good day and it was pushing 6pm we decided to let it sit and we would continue in the next session.

Always a good time and Ralph is a great guy to hang with.....we always have fun while getting progress done!
' style=

Ralph working COAX

Ralph working COAX

' style=

Nutplates in GTN-650 Tray

Nutplates in GTN-650 Tray

' style=

Items installed for power up!

Items installed for power up!