KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  4-26-2022
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Advanced AOA Plumbing (cont)

I continued routing the Advanced AOA lines. I left the lines at the end of the cross brace last night and after looking with a flashlight I determined the best way to route them into the right gear tower was to go through a gap by the brace rather than bundling it with wires towards the main access holes like the wiring. It worked well and I used some edging grommet to protect the tubing from the edges.

I continued to route the wires through the tower, snaking them as I saw fit. I finally got them to the bottom of the tower where I was able to pass them through the large snap bushing and into the cubby area. I then spent time lacing the tubing in a few places.

I am planning on bringing the tubing from the wings into this area and I have plenty of extra which I will leave rolled up here until I get the wings put on to be sure to cut the length correctly and in case plans change. I put some 1/8 tubing push on unions on the end of the tubes where the connection will be made and reside.
' style=

Running Tubing into Tower

Running Tubing into Tower

' style=

Ready to join

Ready to join

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.