KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  4-20-2022
Number of Hours:  0.90
Manual Reference:  
Brief Description:  Electrical Bay Ground Wires

After getting the new evaporator fan in the refridgerator and putting it all together I had a little time for the shop.

I got back in the shop for a short session and installed more fast-on terminals and secured the wires onto the tiedowns. I just need to do a little lacing on the wires and they will be done!
' style=

Just about done

Just about done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.