KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  4-7-2022
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Pickle and Route Wires

A little hiatus while going down to Florida to check up on 92 year old Aunt Tonie. Had to get a bunch of work done around the house such as changing two blinds in her bedroom from the old wide heavy models that were both broken to pleated ones, painting a ceiling, etc etc.

I did get to break for a day at Sun n Fun with my friend (since the 1st grade) Moe who was also down from MI to spend some time in a warmer climate with his wife Candy. I had to change plans because I have to get back and move my Mom from MA to NC. Only had one day to go to SnF and that was the first day - Tuesday. Moe and I met and had a full day of cruising around the area until the closing bell at 1700.

To tonight I got a short session in after trying to play household catch up. At SnF I ordered LPS 3 to re-pickle my engine because Aircraft Spruce said the shipping would be free. It came in today so I made that the first agenda item. I sprayed down all the cylinders good and then sprayed some down the oil filler neck per Barretts instructions. After finishing I replaced the four desicant plug holders.

I began again to sort and run the wires in the electrical bay. I got the EGT/CHT wires routed and tied down before quitting for the night.
' style=

LPS 3 from SnF

LPS 3 from SnF

' style=

EGT/CHT wires routed

EGT/CHT wires routed

' style=

Bob with Moe from Michigan

Bob with Moe from Michigan

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.