KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  3-28-2022
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Ralph assistance again

Ralph is playing bachelor for a few days so he mentioned he may be able to come and help on weeknights for the couple days before my wife and I leave for Florida. I absolutely accepted his offer so after work Ralph showed up and we tackled more.

With the engine dangling in front of the mount Ralph got some wires prepped and pulled to their locations that would best enable good routing passages to their points of termination. He got starter wires and alternator B leads run from the current limiter blocks through the pass through. He worked on schematics in between with his laptop.
' style=

Right Side Pass thru

Right Side Pass thru

' style=

Gandalf Ralph doing his magic

Gandalf Ralph doing his magic

' style=

More wires passin thru!

More wires passin thru!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.