KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  3-23-2022
Number of Hours:  2.20
Manual Reference:  
Brief Description:  Right Console Switching Panel #1

I was fiddling with the USB unit for the console and was trying to remove it to have a little more access to work the switching panel. It was fairly difficult but I got it out. I decided to modify the opening in such a way that it stays secure but can be removed easier than it was this time. So I used files to relieve the opening a bit more.

I then started to work the right console switching panel. I can install several wires on the panel while it is on the bench and after running some continuity test on a couple wires in the console area I began wiring the Pmag switches and got the power wires completed to the CB's.
' style=

USB unit needed modifying

USB unit needed modifying

' style=

Wiring switching panel

Wiring switching panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.