Date:  3-17-2022
Number of Hours:  2.60
Manual Reference:  
Brief Description:  Wire GT-50 and Boost Pump Switch

I worked on the left side of the panel to work some wiring. I installed a cable standoff on the avionics rack support to hold the wires going to the GT-50 Chrono/G-meter and the Boost Pump wires. Got those two items wires routed and mostly wired......I still have to wire the boost pump incicator ligtht wire with the switch wire.

I was checking the continuity on the GT-50 and discovered a short at the connector. I began to trace it and determined there is something shorting out my Buss A on the fuse block. I will check what is going on next session and remedy that problem.
' style=

Wiring left side of panel

Wiring left side of panel