KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  3-3-2022
Number of Hours:  2.20
Manual Reference:  
Brief Description:  Fuse Block Wiring #6

I completed the last of the terminals on the fuse block. I had to remove one terminal in order to re-route the wires to a better position. Removing the fuse terminals from the block is a matter of inserting a wire or pin of some kind in the front of the terminal. There is a small hole above and below each fuse terminal that allows you to push the tabs down and slide out the terminal.

With that done I re-routed the wire and re-inserted the terminal. I decided to take a couple plastic caps and fill them with RTV and set them over the nuts and lugs for the two main busses. Seldom do you ever mess with buss wires in the course of the airplanes life.....but if I need to the caps and RTV will be able to be removed fairly easily.....but I felt it was worth protecting the lugs from chafing and shorting on wires or anything behind the panel.
' style=

Completed & Capped

Completed & Capped

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.