KitLog pro

Powered By Kitlog Pro v2.0

Bob's RV-8 Build Site
' style=
Date:  2-25-2022
Number of Hours:  5.30
Manual Reference:  
Brief Description:  Wire CB Panel (cont)

I continued working on the CB panel and finally got all the breakers connected. As I was inspecting the panel I realized that I had forgotten to replace the CB's that I had changed from the original CB panel setup. I began the task of modifying four circuit breakers. It was time consuming now that the panel was complete to remove the breakers from the panel along with the buss bars and screws. I had to be real careful not to lose any of those screws in the cockpit. I had put towels down and it was fortunate as I dropped screws several times during the process.

I finally got the CB's changed and the panel done. I began to straighted out the Fuse Block area and called it quits for the night.
' style=

Finally all connected

Finally all connected

' style=

Panel with new breakers

Panel with new breakers

' style=

Prepping the Fuse Block

Prepping the Fuse Block

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.